Breshna Company announced that following the completion of the initial and detailed surveys and the determination of tower locations, technical teams have successfully finalized the route of the transmission line. Currently, geotechnical surveys—including excavation, sampling, and soil testing—are underway to ensure the reliable design of the foundations.
According to Breshna Company, this transmission line is a vital project for providing sustainable electricity. The company is committed to completing it in accordance with international standards and within the specified timeframe.

